ConUp research project
Project title: ConUp – Secured procedures for manufacturer-independent parameterization and retrofitting of wind turbine control systems
Summary:
The overarching aim of the joint project is to research a methodology for the safe application of hardware or software modifications to wind turbines to increase yield and / or extend service life. Up to now, such optimizations have hardly been possible regardless of the manufacturer, leaving potential unused. The joint project is developing an additive temporary or permanent system for monitoring critical operating parameters of wind turbines, which can be used on existing wind turbines.
- Project type: Joint project
- Term: 2019 – 2023
- Financing: Funding by BMWK
- Research partners: Windrad Engineering GmbH, Deutsche WindGuard
GmbH, EnergieKontor GmbH
Contact:
University of Oldenburg
Institute of Physics – ForWind
Dr. Hendrik Heißelmann
Küpkersweg 70
D-26129 Oldenburg
Email: info@forwind.de
More information
Project ConUp at EnArgus (with information on project partners)